Creating the infrastructure that keeps processing operations moving.
Supporting ongoing improvements at Talley's Ashburton processing facility, we provided the structural design and documentation for new access platforms and stair systems integrated within the operational plant. Working closely with Phimister Engineering, we coordinated around the processing equipment to develop practical, efficient structural solutions that could be fabricated and installed seamlessly on site.
The project required a collaborative approach between structural, fabrication and process disciplines, ensuring the final design met both operational and construction requirements. The result was a buildable, fit-for-purpose solution that supports the safe and efficient operation of the facility for years to come.